Proposal:  The City of College Place is proposing improvements to approximately 0.5 miles with new curb, gutter, and sidewalk to be constructed on 4th St from Davis Ave to Academy Way and on Academy Way from 4th Street to Whitman Drive (some existing to remain).  New bicycle lanes/cycle track will be constructed on both Academy Way and 4th Street.  Driveways and ADA ramps will be constructed throughout the project. All new facilities will be constructed to existing ADA standards.  Additionally, the road surface will be improved to concrete-treated base and a subsequent hot mix asphalt wear course applied.  The project includes stormwater facilities to address run-off from the project.

Proponent:  The City of College Place, 625 S College Ave, College Place WA 99324

Additional Information:
SEPA CHECKLIST
NOTICE OF APPLICATION
NOTICE OF ADMINISTRATIVE APPROVAL